TSXCPP202
必须完全遵守本手册中提到的建议和要求。万一
无法满足某些要求或建议的任何问题或情况,
之前应咨询施耐德电力变压器部(以下简称SE-TBI)
将产品投入使用。
2、小心搬运变压器及其附件,以免损坏外部零件或
内部组件,因为这可能导致人身伤害和/或电气故障。
3、在质保期内,变压器或变压器的一部分不得拆开维修或
在SE-TBI工程师缺席的情况下,由三方进行内部检查。SE-TBI变压器
在油箱盖螺栓的一角密封。油箱盖打开或损坏
在SE-TBI工程师缺席的情况下盖章将导致保修终止。参见10页的图(i)。
在储存、安装过程中,应防止油被水、水分、灰尘等污染&
调试。由于这些污染导致的产品故障应导致保修
中止。
如果充油变压器的调试延迟超过六个月,油位&
必须每月监测一次机油的BDV,以确保存储期间机油的数量和质量。
油箱油位表(TOLG)中的油位必须可见,以确保内部组件浸入
油因it不合规而导致的故障将导致保修中止。
充电前,所有绕组的绝缘电阻应符合本手册的建议
变压器(参考5节5.3条)
7、CT端子不使用时应短路。参见10页图(ii)



Recommendations & requirements mentioned in this Manual must be fully complied. In case of any issue or a situation where certain requirement or recommendation cannot be fulfilled, Schneider Electric-Transformer division (hereafter referred as SE-TBI) shall be consulted before putting the product in service. 2. Transformer & its accessories shall be carefully handled so as not to damage external parts or inside assembly as this can lead to bodily damage and/or electrical failure. 3. During warranty period, transformer or a part of transformer shall not be opened for repair or internally inspected by third party in absence of SE-TBI Engineer. SE-TBI Transformers are despatched with a seal in one corner of tank cover bolt. Opening of tank cover or damage of this seal in absence of SE-TBI Engineer shall lead to warranty discontinuation. Refer Fig (i) on Page10. 4. Contamination of oil with water, moisture, dust etc shall be prevented during storage, erection & commissioning. Product failure attributed to these contaminations shall lead to warranty discontinuation. 5. In case of delay in commissioning for more than six months in oil-filled transformers, oil level & BDV of oil must be monitored once in a month to ensure quantity & quality of oil during storage. Oil level must be visible in tank oil level gauge (TOLG) to ensure inside assembly is immerged in oil. Failure attributed to non-compliance of it will cause warranty discontinuation. 6. Insulation resistance of all windings shall be as recommended in this manual before charging of transformer.(Refer Clause 5.3 in Section-5) 7. CT terminals shall be shorted if not in use. Refer Fig (ii) on Page-10